๐ Gathering system data: System drawings as-built, project design values, and specifications, type of installed balancing valves.
๐ Preparation: Analyzing the drawings, checking the required conditions, site inspection, selection of the balancing method.
๐ Documentation: General data and data specific to the balancing valves.
๐ Analysis of the results and reporting.
๐ Maintenance recommendation.